User Tools

Site Tools


scrummaster

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
scrummaster [2021/12/14 08:08] 218.212.182.200scrummaster [2022/08/24 02:19] (current) 103.6.151.63
Line 100: Line 100:
 https://www.redagile.com/scrum-guide https://www.redagile.com/scrum-guide
  
-Scrum pillars +Scrum pillars: TIA 
-  * transparency+  * **T**ransparency
-  * inspection, and +  * **I**nspection, and 
-  * adaptation.+  * **A**daptation.
  
-Scrum Values +Scrum Values: OCR FC 
-  * Focusprevent context-switching attention +  * **O**penness: Watermelon - green (okay) on outside but red (danger/critical) or amber inside 
-  * Openness: Watermelon - green (okay) on outside but red (danger/critical) or amber inside +  * **C**ourage: Dare to have hard conversations 
-  * Respect: Mutual +  * **R**espect: Mutual 
-  Commitment,  +  * **F**ocus: prevent context-switching attention 
-  Extreme Courage: Dare to have hard conversations+  * **C**ommitment
  
 Scrum Team Scrum Team
Line 123: Line 123:
   * Sprint Review   * Sprint Review
   * Sprint Retrospective   * Sprint Retrospective
 +  * Scrum Sprint
  
-^ Sprint length ^ Planning       ^ Daily          ^ Review          ^ Retrospective ^ + Sprint length   Planning   Daily   Review   Retrospective   Total hours  ^  Percentage worked  
-| 4 weeks | 8 hours     | 15 mins        | 4 hours | 3 hours | + 4 weeks   8 hours   15 mins   4 hours   3 hours   4 x 7 x 8 = 224 hours  |  91.1%  
-| 2 weeks | 4 hours     | :::        | 2 hours | 2 hours | + 2 weeks   4 hours   :::   2 hours   2 hours   2 x 7 x 8 = 112 hours  |  90.6%  
-| 1 week | 2 hours     | :::        | 1 hour | 1 hour |+ 1 week   2 hours   :::   1 hour   1 hour   7 x 8 = 56 hours  |  90.6%  |
  
  
scrummaster.1639469304.txt.gz · Last modified: 2021/12/14 08:08 by 218.212.182.200

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki