 +===== Tuesday 14 December 2021 =====
 +=== Daily Scrum ===
 +
 +Usual 3 questions + "How do you feel about the Sprint thus far ?"
 +
 +=== Product Grooming/Refinement ===
 +
 +Not defined in the Scrum Guide.  Used to be there, but was dropped in latest version.  Earlier version suggest 10% of Sprint time.
 +
 +Kane suggests that it is critical because it saves time in Sprint Planning Meetings.
 +
 +  * Review and update Product Backlog to adjust and reflect current priorities and business needs.
 +  * With time, there is greater clarity of larger backlog items further away, so good to make them more granular and break them into smaller tasks
 +    * with smaller tasks, some can increase in priority and others adjusted down
 +
 +
 +=== 3 Commitments ===
 +  * Definition of Done: is universal for all increments, unlike Acceptance Criteria which is unique to each
 +  * Product Goal: arising from Product backlog
 +  * Sprint Goal: arising from Product backlog
 +
 +=== Product Backlog Items ===
 +  * Features
 +  * User Stories
 +  * Technical Debt
 +  * Risk Mitigation
 +  * Learnings (from Retropectives ?)
 +
 +
  
 ===== Monday 13 December 2021 ===== ===== Monday 13 December 2021 =====
Line 69: Line 100:
 https://www.redagile.com/scrum-guide https://www.redagile.com/scrum-guide
  
-Scrum pillars +Scrum pillars: TIA 
-  * transparency+  * **T**ransparency
-  * inspection, and +  * **I**nspection, and 
-  * adaptation.+  * **A**daptation.
  
-Scrum Values +Scrum Values: OCR FC 
-  * Focusprevent context-switching attention +  * **O**penness: Watermelon - green (okay) on outside but red (danger/critical) or amber inside 
-  * Openness: Watermelon - green (okay) on outside but red (danger/critical) or amber inside +  * **C**ourage: Dare to have hard conversations 
-  * Respect: Mutual +  * **R**espect: Mutual 
-  Commitment,  +  * **F**ocus: prevent context-switching attention 
-  Extreme Courage: Dare to have hard conversations+  * **C**ommitment
  
 Scrum Team Scrum Team
Line 92: Line 123:
   * Sprint Review   * Sprint Review
   * Sprint Retrospective   * Sprint Retrospective
 +  * Scrum Sprint
  
-   ^ Planning       ^ Daily          ^ Review          ^ Retrospective ^ + Sprint length   Planning   Daily   Review   Retrospective   Total hours  ^  Percentage worked  
-Time   | 8 hours     | 15 mins        | 4 hours | 3 hours |+ 4 weeks   8 hours   15 mins   4 hours   3 hours   4 x 7 x 8 = 224 hours  |  91.1%  | 
 +|  2 weeks  |  4 hours  |  :::  |  2 hours  |  2 hours  |  2 x 7 x 8 = 112 hours  |  90.6%  | 
 +|  1 week  |  2 hours  |  :::  |  1 hour  |  1 hour  |  7 x 8 = 56 hours  |  90.6%  |
  
  